Citizen Staff Writer
IN BRIEF
Three public meetings are scheduled on the proposed alignment for the widening of Grant Road.
The project, with construction starting in 2013, would widen Grant to three lanes in each direction from Oracle to Swan roads. Each meeting is for a specific stretch of road.
• Oracle Road to First Avenue segment: from 4 to 8 p.m. Wednesday at Executive Inn and Suites, 333 W. Drachman St.
• First Avenue to Tucson Boulevard segment: 4 to 8 p.m. Thursday at Salpointe Catholic High School, 1545 E. Copper St.
• Tucson Boulevard to Swan Road: noon to 4 p.m. Saturday at Catalina High School, 3645 E. Pima St.
Citizen Staff Report